Study determines the need for $35 million in repairs at the Challuabamba Fuel Terminal
Published on February 13, 2020

Facebook Twitter Google+ LinkedIn Repairing the cracks in the road and slopes, the fissures in the concrete and stopping the many landslides at the Challuabamba Terminal of the Pascuales-Cuenca Poliduct, is going to cost at least $35 million according to a study recently released by the Public Company of the National Polytechnic School (EP-EPN). EP-EPN was […]
0 Comments